OVO Energy instructed Ceba Solutions to design new catering facilities in both offices located in Cardiff and Cumbernauld.

Our brief was to design and install new catering facilities for OVO Energy which were to include a new café barista coffee and hot snacks area. We were also to include the design and installation of 24hr self-service market areas in both locations, designed specifically for the late shift call centre staff. 

The design was to be mindful of the larger catering facility as staff returned back to work meaning we needed to include scope for an increase in the current space to accommodate everyone. We worked alongside the onsite caterers, Baxterstorey, on this catering project to ensure the new facility met their proposed offer and ticked all of OVO Energy’s requirements.

We managed the project and works from start to finish which included;

  • Stripping out of the existing equipment and furniture
  • New electrics and plumbing throughout the facility
  • New safety flooring laid
  • New shop fitted servery counter installed
  • New catering equipment installed 