A kitchen refurb for St James School along with beautifully re-designed staff and pupil dining rooms. We love the end result of this project.

Background

Ceba Solutions were asked to undertake a kitchen refurb in St James School existing kitchen as well as a full refurb of their staff dining room & pupil dining room.

Challenges and how we achieved them.

Kitchen

  • Re-designed the existing kitchen space.
  • Upgraded the ventilation to meet new regulations
  • Installed new building fabrication such as non-slip safety flooring, PVC wall cladding and a wipe clean suspended ceiling fitted with LED lighting.
  • New Refrigeration system, fabrication & cooking equipment.

Staff Dining Room

  • Created a single linear food service counter to encompass the full menu offering into one area.
  • Fully decorated the dining room and added new furniture

Pupil Dining Room

  • Located in a multi use gym space the design needed to be flexible & mobile
  • Installed new mobile servery counters
  • Installed new fixed dressers located around the dining room
  • Finished the dining room refurbishment with new furniture
  • Added new mobile waste recycling stations
  • New tongue and groove call wall cladding
  • Completely decorated throughout

Do you have a project in mind? Please feel free to get in touch to discuss your requirements.